News Release 2016
- 2016-12-16 JDC started the drilling operation utilizing"SAGADRIL-1" based on the contract with Bunduq Company Limited.
- 2016-08-22 HAKURYU-10 receives Total E&P 2015 Best Rig Performance Award (7 June,2016)
- 2016-05-09 JDC started upfront drilling work utilizing "CHIKYU" based on the contract with Japan Methane Hydrate Operating Co., Ltd.
- 2016-04-11 "HAKURYU-11" started the drilling operation offshore Vietnam
- 2016-03-09 JDC started the drilling operation utilizing "HAKURYU-5" in Vietnam.